meta_pixel
Tapesearch Logo
Log in
The John Batchelor Show

#Ukraine: The Ukrainians are behind schedule. Colonel Jeff McCausland , USA (retired) @mccauslj @CBSNews @dickinsoncol

The John Batchelor Show

John Batchelor

Society & Culture, Arts, News, Books

4.52.8K Ratings

🗓️ 27 June 2023

⏱️ 11 minutes

🧾️ Download transcript

Summary

PHOTO: NO KNOWN RESTRICTIONS ON PUBLICATION.
@BATCHELORSHOW
1 July 1917

#Ukraine: The Ukrainians are behind schedule. Colonel Jeff McCausland , USA (retired) @mccauslj @CBSNews @dickinsoncol
https://www.telegraph.co.uk/world-news/2023/06/26/wagner-failed-coup-ukraine-soldiers-trenches-bakhmut/

Transcript

Click on a timestamp to play from that location

0:00.0

The bell is for me, not for you.

0:02.9

Although, if you're a teacher like me, it is for you.

0:05.6

Because PGL School Adventures is bringing an exciting new approach

0:08.7

to learning outside the classroom.

0:10.5

They've been powering breakthroughs for school children

0:12.6

for over 65 years,

0:14.1

and their new outdoor education program called Reach

0:16.7

is specifically designed to spark breakthroughs in confidence,

0:19.4

teamwork, independence, maybe even archery.

0:22.3

So many inspiring adventures await

0:24.4

that make learning anything but textbook.

0:26.6

Search PGL School Adventures.

0:30.4

This is CBS.

0:33.4

I'm John Bachelin.

0:35.4

The Koo, Mutiny, Rebellion, Pooch, Insurrection,

0:39.4

there are many words, is undetermined.

0:43.4

What we have now is completely

0:45.4

unconfirmed renews reporting out of Moscow.

0:48.8

I move away from all that Russian politics

0:51.8

to join Colonel Jeff McCloson,

0:53.8

the United States Army retired CBS news.

0:57.2

The United States Army retired CBS news, Dickinson College,

...

Please login to see the full transcript.

Disclaimer: The podcast and artwork embedded on this page are from John Batchelor, and are the property of its owner and not affiliated with or endorsed by Tapesearch.

Generated transcripts are the property of John Batchelor and are distributed freely under the Fair Use doctrine. Transcripts generated by Tapesearch are not guaranteed to be accurate.

Copyright © Tapesearch 2026.