S8 Ep815: 1. California Gubernatorial Race and Infrastructure Guest: Jeff Bliss Jeff Bliss discusses the crowded field for the California gubernatorial race and the failures of the high-speed rail project, which faces massive cost overruns and significant design sc
The John Batchelor Show
John Batchelor
4.5 • 2.8K Ratings
🗓️ 2 May 2026
⏱️ 12 minutes
🧾️ Download transcript
Summary
1900 LA
Transcript
Click on a timestamp to play from that location
| 0:00.0 | I'm John Bachelor. I welcome my good friend Jeff Bliss is Pacific Watch. |
| 0:20.0 | We go immediately to the news from |
| 0:22.0 | the Golden State, always in the news, but right now it feels dominating the story of the next |
| 0:28.7 | phase of American politics, which is the presidency and the transportation across the country |
| 0:36.6 | with gasoline, with diesel, or with railroads, |
| 0:39.7 | or with airliners that are running out of jet fuel. |
| 0:42.3 | It's all in California. |
| 0:43.2 | Everything's right there. |
| 0:44.6 | Jeff, a very good day to you. |
| 0:46.0 | I want to begin with the gubernatorial race because I'm losing track of how many candidates |
| 0:50.5 | there are. |
| 0:51.7 | The governor is leaving office this year. The election will be this year, |
| 0:57.2 | and there'll be a new governor in 27. Good. Last time I checked, there was a member of Congress |
| 1:02.9 | who was getting a lot of attention for his alleged misconduct in some fashion to do with young |
| 1:10.8 | women or something like that. A scandal, |
| 1:14.0 | a good old-fashioned Washington scandal. He's left Congress and dropped out of the gubernatorial race. |
| 1:22.3 | But I, and since then there have been debates that you've sent me news about. The debates have |
| 1:27.3 | left everybody head scratching, but there must be something changing in the statistics after these debates. |
| 1:34.5 | Can we say there's a leader now, or is it still everybody neck and neck? |
| 1:37.9 | Good day to you, Jeff. |
| 1:39.4 | Good day, John. |
| 1:40.1 | The leader is still Steve Hilton, the Republican Republican who's a former Fox contributor and, you know, commentator. |
... |
Please login to see the full transcript.
Disclaimer: The podcast and artwork embedded on this page are from John Batchelor, and are the property of its owner and not affiliated with or endorsed by Tapesearch.
Generated transcripts are the property of John Batchelor and are distributed freely under the Fair Use doctrine. Transcripts generated by Tapesearch are not guaranteed to be accurate.
Copyright © Tapesearch 2026.

