Parking BTUs with Buffer Tanks (Part 2)
HVAC School - For Techs, By Techs
Bryan Orr
4.9 • 1K Ratings
🗓️ 19 April 2019
⏱️ 38 minutes
🧾️ Download transcript
Summary
In this two-part interview, Moe Hirsch goes deep and wide on buffer tanks and strategies for "parking" BTUs in hydronic systems.
Systems with a high domestic hot water load can also benefit from a buffer tank. You can pipe the domestic hot water tank as its own zone and step down the rest of the structure. However, there will be some standby losses for a tradeoff greater capacity. You also cannot use the buffer tank as an air eliminator or separator; they work only for BTU parking.
Contrary to popular belief, buffer tanks do NOT prevent flue gas condensation. If the buffer tank reaches 120-130 degrees, then it may prevent flue gas condensation via the flywheel effect. Flue gas condensation on boiler systems has to do with excess air, combustion, and run cycle length.
Moe and Bryan also discuss:
- Water storage temperature
- Using a biomass boiler as a backup
- Stratification: tall tanks vs. wide tanks
- Cycle times and mathematical formulas
- Outdoor reset targets
- Boiler startup conditions
- Manual reset high limit
Transcript
Click on a timestamp to play from that location
| 0:00.0 | and This episode of the HVAC School podcast is made possible by our fantastic sponsors. |
| 0:21.6 | And the first sponsor I want to mention is carrier |
| 0:23.2 | carrier carrier is a longtime partner of Kalo services my contracting business and a |
| 0:28.0 | longtime partner of the HVAC school podcast so thank you to them |
| 0:31.6 | refrigeration technologies at refriggedech. you see school podcast so thank you to them. |
| 0:32.6 | Refrigeration technologies at refriggedec.com |
| 0:35.1 | makers of some of the best chemicals on the market also want to thank Goodway. |
| 0:38.9 | Goodway makes industrial cleaning equipment. |
| 0:41.6 | I mean I guess that would be a way to say it, but things that are specific to our trade made specifically for some of the toughest cleaning jobs that exist. |
| 0:48.0 | If you need to clean cooling tower media, if you need to suck some sludge out of the |
| 0:53.5 | base of a cooling tower a cooling tower basin they make equipment especially |
| 0:57.6 | equipment for doing all of that recirculation devices they even have backpack |
| 1:02.2 | vacuums for that matter. |
| 1:03.1 | Lots of really good stuff and I would encourage you to go over to good Wade.com |
| 1:06.9 | and tell them that Brian at HVAC school sent you. |
| 1:09.7 | Also I want to thank Navac, Navac Global.com, they've been a long time sponsor. They make some excellent tools for the |
| 1:15.2 | HVAC industry. And Field Piece. Field Piece. Field Piece. Field Piece is a company that I can't say enough good things about. They make |
| 1:22.2 | excellent products and we've used |
| 1:23.9 | them for years and I'm very thankful that the new job link probes now connect to |
| 1:28.8 | Measure Quick as you know I'm a big fan of what Jim Bergman made over there |
| 1:31.7 | Measure Quick and if you like Measure Quick, well, then the Field Piece Probes, |
| 1:35.8 | Job Link Probes are one of the best tools that you can use to connect directly |
... |
Please login to see the full transcript.
Disclaimer: The podcast and artwork embedded on this page are from Bryan Orr, and are the property of its owner and not affiliated with or endorsed by Tapesearch.
Generated transcripts are the property of Bryan Orr and are distributed freely under the Fair Use doctrine. Transcripts generated by Tapesearch are not guaranteed to be accurate.
Copyright © Tapesearch 2026.