Midweek with Tyler: Finger on the Pulse
Modern Craftsman
Modern Craftsman
4.8 • 1.2K Ratings
🗓️ 10 August 2023
⏱️ 33 minutes
🧾️ Download transcript
Summary
Tyler answers a viewer email this week asking about business growth, and where to start. Tyler shares his experience of what works for him, and what to look out for when scaling up. Tune in for ways to sustainably and realistically grow your business!
The Modern Craftsman:
linktr.ee/moderncraftsmanpodcast
Find Our Host:
Podcast Produced By:
Music:
"Dessert" by Nate Gusakov
Transcript
Click on a timestamp to play from that location
| 0:00.0 | Do you tell your customers the wait or do you take on more work? It's not that simple. Regardless |
| 0:05.7 | of the size of your business, of the scale of your business, you have to ensure that you understand |
| 0:11.5 | your numbers and you have your finger on the pulse of your business. I understand my costs, |
| 0:15.9 | I understand my overhead. Every hour that I work, I understand how much that I'm making. |
| 0:20.2 | Hello, hello, hello, hello. I can't hear myself. Now I can. I was listening to something with my |
| 0:30.1 | headphones on and I adjusted the audio. I guess it would be output, but it's input into my headphones. |
| 0:37.2 | And I couldn't hear myself talk. Makes it difficult. I'm so used to hearing myself talk on this |
| 0:41.9 | thing. That's going to come back to shoot me in the foot. Oh well. How's it going? |
| 0:49.8 | Everyone, I hope you're your weeks going all right. This week is a little bit different. I have |
| 0:55.6 | a listener email that I'm getting back to as far as my life, my business. We passed building |
| 1:03.9 | inspection on my project yesterday. Should be Monday. Today I met with the insulator, got them started |
| 1:12.6 | Wednesday. Drywall guy is coming by to ensure he has a board count for what he needs. |
| 1:19.4 | Done. I have our insulation inspection schedule for tomorrow and then Thursday. I'm meeting with |
| 1:26.3 | the roofer and to go over what we have as far as scope there and get him a check and then Friday. |
| 1:37.2 | Let's see Friday. What's Friday? I forget what Friday is. Something's happening for. Oh, |
| 1:44.0 | floors are getting delivered on Friday. So we're moving along. It's exciting. |
| 1:51.1 | Drywallers are also starting Friday. So we should be closing things in next week, |
| 1:57.0 | getting some tape coats on, sanding, priming, and then the following week, which would be, |
| 2:02.0 | I believe the week of the 21st hardwood floors will be getting installed. So I'm going to have |
| 2:06.7 | the floors delivered Friday, the floor sub will come and look everything over. And then |
| 2:14.0 | we'll keep everything in a separate space just so it's not terribly affected by the humidity and |
| 2:19.5 | moisture of all of the drywall work that's getting done. And then as soon as they are done and done |
... |
Please login to see the full transcript.
Disclaimer: The podcast and artwork embedded on this page are from Modern Craftsman, and are the property of its owner and not affiliated with or endorsed by Tapesearch.
Generated transcripts are the property of Modern Craftsman and are distributed freely under the Fair Use doctrine. Transcripts generated by Tapesearch are not guaranteed to be accurate.
Copyright © Tapesearch 2026.

