meta_pixel
Tapesearch Logo
Log in
Elis James and John Robins

#471 - John’s Critical Path, Elis’s 0.0% Curry and Dave’s Not So Silent Alarm

Elis James and John Robins

Significant Productions

Comedy

4.86.7K Ratings

🗓️ 12 September 2025

⏱️ 66 minutes

🧾️ Download transcript

Summary

What starts off as a huge day for John (book deadline day) turns into a massive (massive it is) day for poor old Dave.

As the saying goes: ‘The best laid plans of podcast producers often go awry’, and Dave’s idea for the team to record remotely gets derailed quite spectacularly by a faulty alarm system. Brace yourselves for the most stressed you will probably ever hear one of the UK’s most unflappable men.

Back to John, and he tells us early on that he’s feeling ‘absolutely dreadful’. Book deadline day is taking its toll, but luckily a text from Elis’s brother-in-law lifts his spirits, as does the arrival of a record in the post for poor old stressed Dave.

There’s the start of a podcast feud with No Such Thing As A Fish, chat about successfully bartering with a supermarket, and the introduction of a new jingle that wouldn’t be out of place on Lou Reed’s Transformer.


To get in touch with the show, email hello@elisandjohn.com


For lots of exclusive EJJR #content, join our Patreon at patreon.com/elisandjohn

For weekly visual highlights, head to youtube.com/@elisandjohn 

For everything else, head to elisandjohn.com


The Elis James and John Robins Show is a Significant Production 




Hosted on Acast. See acast.com/privacy for more information.

Transcript

Click on a timestamp to play from that location

0:00.0

He scored goals, lifted trophies and broken records along the way.

0:05.4

And now he's got a podcast.

0:07.2

Welcome to the Wayne Rooney show.

0:09.2

Twice a week, Wayne Rooney, Kay Kerd and me, Kelly Summers,

0:12.6

break down the biggest stories in the Premier League and beyond.

0:15.6

As much as you'd like to say,

0:16.7

loyalty in football now is no existence, whether that's fun players or managers.

0:20.5

Plus, we'll hear the funniest, wildest and most outrageous stories

0:24.0

From Wayne's career

0:25.0

The Wayne Rooney Show

0:26.1

It's what everybody's talking about

0:28.1

Watch an eye player, listen on Sounds

0:30.0

BBC Sounds

0:32.6

Music, radio, podcasts Radio Podcasts. Hello, Hello everyone, and welcome to the Ellis James and John Robbins show

1:00.1

and we are coming remote.

1:03.2

We are from our three digital islands this week

1:06.6

due to train strikes in London,

1:09.3

which Dave hates.

1:10.8

Ellis is a big fan of,

1:12.1

and I think is a complex picture.

1:17.0

I was happy to cycle in.

1:19.4

That's the thing, but obviously...

...

Please login to see the full transcript.

Disclaimer: The podcast and artwork embedded on this page are from Significant Productions, and are the property of its owner and not affiliated with or endorsed by Tapesearch.

Generated transcripts are the property of Significant Productions and are distributed freely under the Fair Use doctrine. Transcripts generated by Tapesearch are not guaranteed to be accurate.

Copyright © Tapesearch 2026.