meta_pixel
Tapesearch Logo
Log in
Woman's Hour

Singer, Sophie Ellis-Bextor; Breast reconstruction delays; Urban hermits; Predatory marriage;

Woman's Hour

BBC

Society & Culture

4.13K Ratings

🗓️ 14 October 2021

⏱️ 58 minutes

🧾️ Download transcript

Summary

Sophie Ellis-Bextor has seven albums, five children, a podcast and her Live Kitchen Discos during lockdown were a means of virtual escapism for many, and became weekly moments of united sequined catharsis. She joins Emma to discuss her memoir Spinning Plates: Music, Men, Motherhood and Me.

Claudia Webbe, a former Labour MP for Leicester East, who now sits as an independent, was found yesterday guilty of one charge of harassment and is awaiting sentencing. She has vowed to remain an MP while she appeals against the conviction but the Labour party has called for her to resign, strongly condemning her actions. Those actions include threatening a woman with sending naked photos of her to her family and that she would throw acid in her face. We hear from solicitor Ayesha Nayyar, who has acted for a number of acid attack victims and campaigns for better support for survivors.

Surgeons say women are being refused reconstructive breast surgery on the NHS, even though there are now ways of performing the operation more quickly. The confederation of British surgery say the procedure can be reduced from the traditional 8-12 hours down to 2-3, and hospital stays from 7 days to just 72 hours. Yet surgeons say many NHS Trusts still deem breast reconstruction as ‘cosmetic’, and are performing less than two-thirds of the amount of reconstructions they were pre-Covid.

There are an estimated 1000 hermits living in Italy - and the majority of them are women. The history of female hermits goes back hundreds of years, with many choosing to remove themselves from a life of marriage and domesticity to a world of study, devotion and freedom from the expectations of society. But what is it like to be a hermit living in the modern world? Emma speaks to urban hermit Julia Bolton-Holloway about the misconceptions people have about the eremitical life, her journey from university lecturer to Anglican nun and now Catholic hermit - and how she balances a life of poverty, chastity and obedience with a dedication to actively helping those most in need.

Predatory marriage involves a vulnerable adult being led into a marriage which financially benefits their new spouse. We discuss with Daphne Franks, who believes that her mother was a victim of a predatory marriage; and Dr Rachael Clawson, Associate Professor in Social Work at the University of Nottingham.

Presenter: Emma Barnett Producer: Kirsty Starkey

Interviewed Guest: Ayesha Nayyar Interviewed Guest: Nicola Johnston Interviewed Guest: Dhalia Masud Interviewed Guest: Julia Bolton-Holloway Interviewed Guest: Daphne Franks Interviewed Guest: Dr Rachael Clawson Interviewed Guest: Sophie Ellis-Bextor Photographer: Laura Lewis

Transcript

Click on a timestamp to play from that location

0:00.0

Choosing what to watch night after night the flicking through the endless

0:06.8

searching is a nightmare we want to help you on our brand new podcast off the

0:11.8

telly we share what we've been watching

0:14.0

Fladiated.

0:16.0

Load to games, loads of fun, loads of screaming.

0:19.0

Lovely. Off the telly with me Joanna Paige.

0:21.0

And me, Natalie Cassidy, so your evenings can be a little less

0:25.0

searching and a lot more auction listen on BBC Sounds, music radio podcasts.

0:35.0

Hello, I'm Emma Barnet and welcome to Woman's A from BBC Radio 4.

0:40.0

Hello and welcome to the programme, on the day where the health secretary has told

0:43.6

gees in England to see more patients face to face while unveiling what's been called

0:47.7

a 250 million pound winter rescue package surgeons have told this programme that women are being refused reconstructive

0:54.7

breast surgery on the NHS. It's of course part of a bigger picture of what the pandemic

0:59.4

has meant for wider health care. You're also just hearing there in the news about any

1:03.4

waiting times having got worse. But surgeons are also concerned and this is

1:07.3

something we'll get into that NHS trusts are still deeming breast

1:10.9

reconstruction as a cosmetic procedure. Now you may have a

1:14.3

particular view or experience of that story and of course I want to hear from you an 84844

1:19.5

but what I wanted to know also more broadly today is how the pandemic has affected your health care,

1:25.4

what hasn't happened perhaps that should have done, what effect this has had on you and those around you.

1:31.4

What have you or a loved one not been able to sort the

1:35.0

unintended health consequences of a global pandemic? Text me here at

...

Please login to see the full transcript.

Disclaimer: The podcast and artwork embedded on this page are from BBC, and are the property of its owner and not affiliated with or endorsed by Tapesearch.

Generated transcripts are the property of BBC and are distributed freely under the Fair Use doctrine. Transcripts generated by Tapesearch are not guaranteed to be accurate.

Copyright © Tapesearch 2026.