meta_pixel
Tapesearch Logo
Log in
The John Batchelor Show

1/2: USNAVY: Commercial ship-building yards to support the fleet. Jerry Hendrix, Sagamore Institute

The John Batchelor Show

John Batchelor

Society & Culture, Arts, News, Books

4.52.8K Ratings

🗓️ 14 February 2024

⏱️ 15 minutes

🧾️ Download transcript

Summary


1/2: USNAVY: Commercial ship-building yards to support the fleet. Jerry Hendrix, Sagamore Institute
https://www.wsj.com/world/china/chinas-shipyards-are-ready-for-a-protracted-war-americas-arent-d6f004dd?mod=wknd_pos1&mod=wknd_pos1

1776 after the fire

Transcript

Click on a timestamp to play from that location

0:00.0

Meet Jills. Hi a yoga teacher. I can move from an eagle to a tree in seconds, but managing my budget to provide for my family today and in the future. Tough balancing act.

0:11.0

Thankfully, Aviva can help.

0:13.5

With life insurance from £5 per month, you can help protect your loved ones.

0:17.6

And breathe.

0:19.3

Search Aviva life, helping solve your life insurance puzzles, it takes Aviva.

0:25.2

The price you pay depends on the cover chosen in your personal circumstances. This is CBS.

0:35.0

This is CBS on the world.

0:37.0

I'm John Bachelor.

0:38.0

The Wall Street Journal reporting about American shipyards

0:41.0

and the demands for the Navy's protection of the sea lanes of North America,

0:49.7

of its own people in a conflict zone that moves from the East Asia, the South China Sea, to the

0:57.5

Indian Ocean, to the Gulf, to the Red Sea, to the Mediterranean, into the Atlantic. I welcome

1:04.3

Captain Jerry Hendricks, United States Navy retired

1:07.2

aviator now at the Sagamore Institute, writing about the need the Navy has

1:12.4

for shipyards and a Wall Street Journal has a piece in these

1:15.0

last hours that restates in the journals fashion the demand and the need this sentence, America's shipyards are struggling to keep up with

1:25.2

peace time demand. Submarines are bogged down by maintenance delays and new ones are behind

1:30.9

schedule. The Navy is expecting two new Virginia-class

1:34.3

submarines a year but is receiving the boats at the rate of 1.4. There isn't

1:40.2

enough trained labor dry docks or in short supply and in case of some critical

1:45.7

components only a handful of vendors are still standing.

1:49.3

Jerry a very good evening to you.

...

Please login to see the full transcript.

Disclaimer: The podcast and artwork embedded on this page are from John Batchelor, and are the property of its owner and not affiliated with or endorsed by Tapesearch.

Generated transcripts are the property of John Batchelor and are distributed freely under the Fair Use doctrine. Transcripts generated by Tapesearch are not guaranteed to be accurate.

Copyright © Tapesearch 2026.